Southwestern Wisconsin School District

Learning Environment and Energy Savings Performance Project

  • $5,218,818

    Contract
  • 124,250

    Square Feet
  • Sept 2017

    Completion Date

Project Description

The Southwestern Wisconsin School District selected Performance Services to complete critical infrastructure and learning environment improvements in every classroom in the District. The result is current systems that are energy-efficient, maintainable, and enhanced the learning environment for students, teachers, and staff.

Energy and Learning Environment Needs

Temperature

  • Removed old unit ventilators and install new vertical Middle School classroom units
  • Addition of cooling to the Middle School Building
  • Removed existing network control panels and replaced digital control system

Indoor Air Quality

  • Added CO2 sensors with outside dampers at minimum position
  • Provided air and water balancing of all HVAC equipment

Air Distribution

  • New vertical classroom units with overhead air distribution
  • Installed new air relief fans with variable speed fan drives
  • Installed new exhaust fans
  • Installed New door frames to reduce air infiltration

Illumination

  • New LED lighting and lay in ceilings with occupancy sensors

Security

  • New fire alarm system and secure entrance at the Middle School

Energy Efficiency

  • High efficiency condensing boilers
  • New central chillers with remote outdoor air-cooled condensers
  • Domestic hot water heater
  • Added roof insulation and membrane to all roof surfaces at Middle School