Greendale School District

  • Aug 2015

    Completion Date
  • $3,800,000

    Contract Total
  • 16%

    Utility Cost Reduction

Project Description

Performance Services worked with Greendale School District to assess new energy solutions for three elementary schools, Greendale Middle School, and Greendale High School. Greendale was looking for a partner with transparent policies and practices. Performance Services exceeded the requirements with their transparent open-book pricing, integrated design and delivery approach, and cost-effective solutions. Alternative energy solutions such as solar and geothermal were also proposed by Performance Services. As a result, Greendale Schools is collaborating with Performance Services and has become part of a true partnership to bring efficient and effective energy solutions to the school district.

Learning Environment Solutions

Alternative Energy Solutions

  • Installation of UV solar collector to heat water, reducing natural gas consumption

Energy Savings

  • Operating efficiency of pool improved with new pool cover and UV light in filter system to reduce chemical usage
  • Digital, vendor-neutral controls installed for better HVAC equipment scheduling
  • Replacing inefficient single-pane windows with energy-efficient windows
  • Switched from steam heating coils to new hot water heating coils

Temperature

  • Air conditioning added to classrooms
  • High-efficiency hot water boiler installed

Lighting

  • Parking lot and exterior lighting replaced with energy-efficient LED fixtures

Controls

  • Installed Tridium JACE panels to allow vendor-neutral protocol controls in building
  • New CO2 sensors
  • Installed kW demand meters and implemented peak demand limiting

Total square footage: 550,911