Project Description
North White School Corporation was looking for creative ways to reduce its energy costs. They chose to implement solar energy and upgrade the lighting in the school buildings to LED lighting. The Corporation selected Performance Services to implement a guaranteed energy savings project that will reduce overall electricity consumption, saving $174,171 in energy costs annually. Two ground-mounted solar arrays were installed: one connected to the elementary school building and the other connected to the middle/high school building. LED lighting was also installed at North White Elementary School.
Solar Arrays
- 2 ground-mounted solar arrays
- 3,048 solar panels total
- Solar panels generate 1,453,486 kWh energy