Project Description
Marshall County Schools needed to update their building systems and make them more energy-efficient. The District selected Performance Services to implement a guaranteed energy savings project that will result in $434,097 of guaranteed energy and operational savings on an annual basis. The project includes improvements to all district buildings.
Project Highlights
- New air handling units and new high-efficiency condensing boilers and chillers
- Added variable frequency drives to air handlers and pumps
- Replaced domestic hot water heater with high-efficiency water heaters
- Replaced rooftop HVAC units
- Replaced lighting with new LED lighting
- Replaced toilets, urinals, faucets, and other devices with low water flow devices
- Weather-stripped doors and seal gaps to prevent outside air infiltration
- Installed variable volume controls on the kitchen exhaust hoods and makeup air units
- New controls on equipment and new control strategies for more efficient control